Teck Maintains 2026 Guidance With Copper Production 455–530K Tonnes, Zinc 410–460K Tonnes, Unit Costs Unchanged
GuidanceThere are no changes to our previously disclosed guidance, which is outlined in summary below and our usual guidance tables, including 2027–2028 production guidance, can be found on pages 26–29 of Teck's first